h Ribbed Formwork (also known as demolition of the template-free network) is to use hot-dip zinc steel, according to BSEN 10142 1991 Fe P03GI + FeP02GI Z275 are made of mesh, and their U-section is based on high-tech computerized automation suppressed by the cut Cheng, board surface as a whole made no contact, anti-tension exceptionally strong.
High Ribbed Formwork as expendable template fixed. When the
template behind the pouring of concrete, the mesh on the Yujiao the
CD, we embedded in concrete to form a casting connected to the
block and the neighboring mechanical wedge. Seam quality is
strictly controlled. Its adhesion and shear strength in dealing
with a well-stitched comparable crude Zhuo.
High Ribbed Formwork features:
1、Mechanical performance is good, by the small lateral pressure is
equivalent to the general pressure for 60% of the template, it can
reduce the amount of template support for 40% of the keel.
2、Direct observation casting process because of their special mesh,
can the naked eye to monitor the casting works, thereby reducing
the risk of pores and cellular arise.
3、Light weight, easy transportation and installation of steel
weight is only one-tenth of normal shape, the installation quick
and easy transport.
4、 Optimization process, increase the shear interface, when the
mortar pouring hole through the mesh grid made of a penetration
into the interface shear behavior of a very good coarse-grained
interface
5、Easy to wear and continuous lashing reinforced by the tendons
heal with the dense network of specialty porous mesh, a slight
force can be reinforced through the use of 12mm below. The steel
can be cut slightly larger diameter of the grid, to be reinforced
through the location after the board back to be. The hy-rib can
also be installed on the steel prior to banding, and then piercing
through their mesh installed.
6、To adapt to sub-cast concrete, construction, civilization, a
permanent template, no need to form removal or market manipulation
can be bonded joints and to prepare for the next pouring of
concrete, so a simplified interface for preparatory work.
7、Easy to operate multi-socket and cutting performance, easy to
cut, can be based on the requested extension bending mode shape of
the inflection.
See more products from this supplier.
Do you want to show products of your own company? Join FREE now!